Day-ahead probabilistic model for scheduling the operation of a wind pumped-storage hybrid power station: overcoming forecasting errors to ensure reliability of supply to the grid
PBN-AR
Instytucja
Wydział Zarządzania (Akademia Górniczo-Hutnicza im. Stanisława Staszica w Krakowie)
Informacje podstawowe
Główny język publikacji
EN
Czasopismo
Sustainability (20pkt w roku publikacji)
ISSN
EISSN
2071-1050
Wydawca
Multidisciplinary Digital Publishing Institute AG
DOI
Rok publikacji
2018
Numer zeszytu
6, art. no. 1989
Strony od-do
1--21
Numer tomu
10
Link do pełnego tekstu
Identyfikator DOI
Liczba arkuszy
1.5
Autorzy
(liczba autorów: 2)
Pozostali autorzy
+ 1
Słowa kluczowe
EN
scheduling
reliability
hybrid energy sources
variable renewable energy sources
nondispatchability
Open access
Tryb otwartego dostępu
Otwarte czasopismo
Wersja tekstu w otwartym dostępie
Wersja opublikowana
Licencja otwartego dostępu
Creative Commons — Uznanie autorstwa
Czas opublikowania w otwartym dostępie
Razem z publikacją
Streszczenia
Język
EN
Treść
Variable renewable energy sources (VRES), such as solarphotovoltaic (PV) and wind turbines (WT), are starting to play a significant role in several energy systems around the globe. To overcome the problem of their non-dispatchable and stochastic nature, several approaches have been proposed so far. This paper describes a novel mathematical model for scheduling the operation of a wind-powered pumped-storage hydroelectricity (PSH) hybrid for 25 to 48 h ahead. The model is based on mathematical programming and wind speed forecasts for the next 1 to 24 h, along with predicted upper reservoir occupancy for the 24th hour ahead. The results indicate that by coupling a 2-MW conventional wind turbine with a PSH of energy storing capacity equal to 54 MWh it is possible to significantly reduce the intraday energy generation coefficient of variation from 31% for pure wind turbine to 1.15% for a wind-powered PSH The scheduling errors calculated based on mean absolute percentage error (MAPE) are significantly smaller for such a coupling than those seen for wind generation forecasts, at 2.39% and 27%, respectively. This is even stronger emphasized by the fact that, those for wind generation were calculated for forecasts made for the next 1 to 24 h, while those for scheduled generation were calculated for forecasts made for the next 25 to 48 h. The results clearly show that the proposed scheduling approach ensures the high reliability of the WT–PSH energy source.
Cechy publikacji
original article
peer-reviewed
Inne
System-identifier
idp:114651
CrossrefMetadata from Crossref logo
Cytowania
Liczba prac cytujących tę pracę
Brak danych
Referencje
Liczba prac cytowanych przez tę pracę
Brak danych