Influence of the liquidated sulphur excavation Piaseczno on the water conditions in its surroundings
PBN-AR
Instytucja
Główny Instytut Górnictwa
Informacje podstawowe
Główny język publikacji
en
Czasopismo
Science and Technologies in Geology, Exploration and Mining Conference Proceedings
ISSN
1314-2704
EISSN
Wydawca
International Multidisciplinary Scientific GeoConference & EXPO SGEM
DOI
URL
Rok publikacji
2018
Numer zeszytu
1.2
Strony od-do
387-394
Numer tomu
18
Link do pełnego tekstu
Identyfikator DOI
Liczba arkuszy
Autorzy
(liczba autorów: 5)
Pozostali autorzy
+ 4
Słowa kluczowe
en
open pits liquidation
hydrogeological forecasts
groundwater flow modelling
Konferencja
Indeksowana w Scopus
tak
Indeksowana w Web of Science Core Collection
nie
Liczba cytowań z Web of Science Core Collection
Nazwa konferencji (skrócona)
SGEM 2018
Nazwa konferencji
18 International Multidisciplinary Scientific GeoConference
Początek konferencji
2018-06-30
Koniec konferencji
2018-07-09
Lokalizacja konferencji
Albena
Kraj konferencji
BG
Lista innych baz czasopism i abstraktów w których była indeksowana
Streszczenia
Język
en
Treść
The post-mining excavation "Piaseczno" is located in the south-eastern part of Poland, on the left bank of the Vistula River. After the extraction of sulfur and later sands in 1981, the pit remains in an unliquidated state. Its area is 167 ha, and the depth reaches 46.0 m. During the process of self-flooding of the excavation with water flowing in from the Neogene and Quaternary aquiferous, water level reached an ordinate of 138.0 m. This state has been maintained since 2012 by draining water from the created reservoir to Vistula in the amount of about 18,000 m3/d. Excavation "Piaseczno" acts as a drainage in relation to the adjacent areas, protecting them against flooding. The long-term functioning of the open pit dewatering system has dried the areas around it, which created favorable conditions for changing the way of they usage. In the place of swampy, flooded and meadows areas, orchards and arable fields were created, as well as housing areas have developed. Hydrogeological multivariate forecasts were made on a numerical model of the Tarnobrzeg Sulfur Basin using the results of the groundwater monitoring. The results of simulations made it possible to indicate the optimal solution in the field of water-ground relations in the areas within the depression range of the liquidated excavation "Piaseczno", depending on the height of the water level in the reservoir. Increasing the water table level in the reservoir should follow according to the adopted schedule of the construction of ditches network and observations of changes in the Quaternary aquifer in the area surrounding the reservoir. Forecasts for damming water to the target height of 146.0 m above sea level indicate the possibility of gradual of works protecting the areas in the Piaseczno area against the effects of the progressive rebuilding of the original water conditions. The achievement of the final height of water in the reservoir must be preceded by the implementation of the basic drainage system, supplemented with specific melioration on selected areas of the land.
Inne
System-identifier
PX-5b890087d5de98750836350a
CrossrefMetadata from Crossref logo
Cytowania
Liczba prac cytujących tę pracę
Brak danych
Referencje
Liczba prac cytowanych przez tę pracę
Brak danych